Abstract: Two Manpower planning models with different recruitment patterns are studied. During the operation time a machine produces random number of products. After the operation time, the sale time starts, and it has one among two distinct distributions depending on the magnitude of production is within or exceeding a random threshold magnitude. In this paper, the operation times have SCBZ property and the man power system, sales and recruitment have general distribution. Joint transforms of the variables, their means and covariance operation time and recruitment time with numerical results are presented. Mathematics Subject Classification: 91B70
Keywords: Departure and Recruitments, Failure and Repairs, Production and Sale times, Joint transform
[1]. Barthlomew. D.J,Statistical technique for manpower planning, John Wiley, Chichester(1979)
[2]. Esary.J.D, A.W. Marshall, F. Proschan, Shock models and wear processes, Ann. Probability, 1, No. 4 (1973), 627-649
[3]. Grinold.R.C,Marshall.K.T, Manpower Planning models, North Holl, Newyork (1977)
[4]. Hari Kumar.K, P.Sekar and R.Ramanarayanan, Stochastic Analysis of Manpower levels affecting business with varying
Recruitment rate, International Journal of Applied Mathematics, Vol.8,2014 no.29, 1421-1428.
[5]. Hari Kumar.K, Manpower System with Erlang departure and one by one Recruitment, International Journal of Mathematical
Archive-5(7),2014, 89-92.ISSN 2229-5046.
[6]. Lesson .G.W, Wastage and Promotion in desired Manpower Structures, J.Opl.Res.Soc.,33(1982)433-442.